
From the base to the first barrier cycle.
Royal Hatcheries’ vehicle entrance is the setting for this eSSL boom-barrier installation by Smart Bio Nexus. The site photos and videos record the work at ground level: the prepared concrete base, the cabinet on its anchors and the team fitting the boom arm.
For a vehicle-entry project, the equipment and its mounting need to be considered together. This installation journal brings those practical details into view, so customers can see the work behind the finished barrier.
Installed system.
Installation completed on 25 February 2025.
6-metre arm
See the barrier in action.
The site demonstration shows the boom arm opening and closing across the approach. Press play to watch the actual installation.
The installation, in detail.
Three views of the base and cabinet document the stages behind the installation. Open any photograph to see the original full-size view.



The cover photograph shows the team fitting the boom arm at the cabinet.
Behind the installation.
A closer look at the mounting work and equipment unpacking, captured at the same site.
Base mounting
Unpacking on site
Project location.
Royal Hatcheries
Kanathur Angalamman Kuppam, Koovathur, Kanchipuram – 603305, Tamil Nadu
Installation by Smart Bio Nexus · Authorised eSSL, ZKTeco, Biomax partner.
Planning a boom barrier for your entrance?
Share the site location, entrance width, vehicle movement and available power connection. Our team can help you choose equipment and define the installation scope for your site.
Explore boom-barrier products · Read the customer buying guide
Plan a similar installation.
Talk to Smart Bio Nexus about your workplace requirements.
Discuss your project